Library Construction New Library Plans | Construction Photos |
| Construction Photos
|
|
| The first step was removal of asbestos tile on the floor. |
![]() |
| Construction area on north side of Noyes Lab. (11/20/2005) |
![]() |
| Outside wall between old and new parts of Noyes Lab. New doors will be cut through the brick wall. (11/20/2005) | ![]() |
(12/03/2005) |
![]() |
| Site of future entry to the new Chemistry Library. (12/17/2005) |
![]() |
| Here is the new door to the library from the west hall ... a little paint would help! (1/14/2006) |
![]() |
| Ceiling ducts (3/07/2006) |
![]() |
| New windows (3/07/2006) |
![]() |
| Studs going up (3/07/2006) |
![]() |
|
![]() |
| Classroom shelves (05/10/2006) |
![]() |
The stairs leading to the lower level of the existing library |
![]() |
| Drywall is up (6/01/2006) |
![]() |
| More drywall (6/01/2006) |
![]() |
| The circulation desk (6/01/2006) |
![]() |
| Circulation desk drywalled (6/01/2006) |
![]() |
| The new entrance (6/01/2006) |
![]() |
| All the walls are in (6/01/2006) |
![]() |
| Tina Chrzastowski's future office (6/06/2006) |
![]() |
| Classroom shelves (06/09/2006) |
![]() |
| Librarian office walls going up (6/10/2006) |
![]() |
| It was a wall, but now it's going to be a door to the library (6/17/2006) |
![]() |
| The middle of the flooring proccess (6/17/2006) |
![]() |
| First floor wall (06/21/2006) |
![]() |
| The library hallway (06/21/2006) |
![]() |
| The main door frame (6/28/2006) |
![]() |
| The new cabinets (6/28/2006) |
![]() |
| The north room (6/28/2006) |
![]() |
| The new shelves (6/28/2006) |
![]() |
| More shelves are up (7/01/2006) |
![]() |
| The circulation desk (7/01/2006) |
![]() |
| The south room (7/01/2006) |
![]() |
The work station |
![]() |
| The circulation desk (07/07/06) |
![]() |
| Behind the circulation desk (07/07/06) |
![]() |
| Tina's office (07/07/06) |
![]() |
| The stacks (07/07/06) |
![]() |
| More of the stacks (07/07/06) |
![]() |
| The library circulation desk (07/07/2006) |
![]() |
| The new book return (unstained). (07/15/2006) |
![]() |
| The circulation desk and work area. (07/15/2006) |
![]() |
| More of t he circulation desk and work area. The lights wil eventually be higher above the counter. (07/15/2006) |
![]() |
| The main doors. (07/15/2006) |
![]() |
| Moving books from the old shelves to the new shelves. (07/19/2006) |
![]() |
| More moving of the books from the old shelves to the new shelves. (07/19/2006) |
![]() |
Figuring out how much extra space to have on each shelf. |
![]() |
| The old library sign.
(07/19/2006) |
![]() |
| Most of the reference books have been moved to the new location.
(07/19/2006) |
![]() |
Row after row of empty shelves.. |
![]() |
| Tina looks fondly at the old library tables.
(07/19/2006) |
![]() |
| Getting down to the last of the monographs.
(07/19/2006) |
![]() |
| The new employee desks. (07/21/2006) |
![]() |
| Tina's office, sans furniture. (07/21/2006) |
![]() |
| Empty shelves in the old space. (07/21/2006) |
![]() |
| Rows of empty shelves in the old space. (07/21/2006) |
![]() |
| The old iron shelves from the old library space. (07/21/2006) |
![]() |
| The empty library space - this used to be the books stacks. (07/24/2006) |
![]() |
| It's official! (07/24/2006) |
![]() |
|
|